Kovačević, N. V. (2015). Organization of engineering works in deploying a bridge crossing point made of class 20 pontoon material. Vojnotehnički Glasnik Military Technical Courier, 65(4), 1060-1079. https://doi.org/10.5937/vojtehg65-8634