IMETIEG, Abdallah Ali; LUTOVAC, Miroslav. Project scheduling method with time using MRP system - A case study: Construction project in Libya. The European Journal of Applied Economics, [S. l.], v. 12, n. 1, 2015. DOI: 10.5937/ejae12-7815. Dostupno na: https://asistent.ceon.rs/index.php/sjas/article/view/7815. Pristupljeno: 12 jul. 2026.