Gacevski, V., Lazarevska, M. and Zafirovski, Z. (2024) “RANKING OF TOTAL TIME RESERVES FOR DETERMINATION OF THE CRITICAL PATH IN FUZZY NETWORK PLAN”, Journal of Applied Engineering Science, 22(2), pp. 297–302. doi:10.5937/jaes0-50535.