Gacevski, V., Lazarevska, M., & Zafirovski, Z. (2024). RANKING OF TOTAL TIME RESERVES FOR DETERMINATION OF THE CRITICAL PATH IN FUZZY NETWORK PLAN. Journal of Applied Engineering Science, 22(2), 297-302. https://doi.org/10.5937/jaes0-50535